Clean Sky 2 Call for Core Partners Wave 1 · LifeRCraft Airframe - Central and Front Fuselage Sections - Design, Optimization, Manufacturing, V&V including Airworthiness Substantiation
Horizon 2020Horizon 2020€206m
Scope:Fuselage to be integrated with tail unit realised as part of the AIRFRAME ITD Topic 02-02 (ref. JTI-CS2-CPW-AIR-02-02; WP B4.1-2) and with wing realized in AIRFRAME ITD Topic 02-04 (ref. JTI-CS2-CPW-AIR-02-04; WP B1.1-2) The optimized main airframe supports the wing, the main gearboxes, and t…